How to Install a Bathtub: Install an Acrylic Tub and Tub Surround
Mounting a bathtub isn't precisely rocket science, yet it does require solid plumbing, woodworking, and occasionally, tiling skills. Replacing an old bath tub with a new one is likewise a reasonably challenging task. If the old tub is easily obtainable, the project can move easily; if you have to open a wall surface to get rid of the old tub as well as position the brand-new bath tub, the task is much harder. In either case, the job is within a residence handyman's skills, although you will certainly require a helper to move out the old bathtub and also embeded in the new one. Ensure you have actually certified on your own for the job and are comfortable trying it. As opposed to working with a contractor to take over a halfway-completed job, it is much better to take into consideration using one prior to you begin. Opportunities are you may need a professional plumber to make tube links.
This article will certainly aid you install a new tub in your shower room if you have actually currently bought a new tub as well as do not need to alter the setup of your previous water pipes.
Your tools as well as product list need to consist of the following:
  • New Bath tub

  • Hammer

  • Pipe Wrenches

  • Prybar

  • Safety Glasses

  • Level

  • Pliers

  • Flexible Wrench

  • Putty Blade

  • Screwdriver

  • Cold Knife

  • Measuring tape

  • Pipeline Caps


  • Removing Old Taps


    If you need to replace old taps with new ones as a part of your installation, then the first thing you ought to do is detach the water system. After doing so, activate the faucets to drain pipes any kind of water remaining in the system. The process of removing the existing taps can be quite problematic due to the restricted access that is frequently the situation.
    Utilize a basin wrench (crowsfoot spanner) or a tap tool to undo the nut that connects the supply pipelines to the faucets. Have a towel all set for the continuing to be water that will certainly originate from the pipelines. When the supply pipes have been removed, use the same device to loosen up the nut that holds the faucets onto the bath/basin. You will certainly need to stop the single faucets from transforming throughout this process. When the taps have been removed, the holes in the bath/basin will have to be cleaned up of any type of old sealing compound.
    Before proceeding to fit the new taps, compare the pipe links on the old faucets to the new faucets. If the old faucets are longer than the brand-new taps, then a shank adapter is needed for the brand-new taps to fit.

    Fitting New Taps


    If the tails of the brand-new taps are plastic, then you will certainly require a plastic port to prevent damage to the string. One end of the adapter fits on the plastic tail of the tap and the various other end supplies a connection to the existent supply pipelines.
    If you require to fit a monobloc, then you will call for minimizing couplers, which links the 10mm pipe of the monobloc to the typical 15mm supply pipeline.
    Next, position the faucet in the placing opening in the bath/basin guaranteeing that the washers are in place in between the tap and the sink. Safeguard the tap in position with the maker offered backnut. Once the faucet is securely in position, the supply pipes can be connected to the tails of the faucets. The taps can either be attached by utilizing corrugated copper piping or with normal faucet connectors. The previous type should be linked to the tap ends initially, tightening just by hand. The supply pipelines can later on be connected to the various other end. Tighten both ends with a spanner after both ends have actually been connected.

    Mounting the Tub


    Making use of the two wooden boards under its feet, put the bathtub in the needed position. The wooden boards are helpful in uniformly spreading the weight of the tub over the area of the boards rather than focusing all the weight onto 4 small points.
    The following goal is to make certain that the tub is leveled all round. This can be attained by inspecting the level and readjusting the feet on the bathtub until the level checks out level.
    To mount taps, fit the bottom of the outermost versatile faucet port to the appropriate supply pipeline by making a compression join; after that do the exact same for the other faucet.
    Turn on the water system and examine all joints as well as brand-new pipework for leaks and also tighten them if required. Load the tub and likewise check the overflow electrical outlet as well as the regular outlet for leakages.
    Lastly, fix the bathroom paneling as described in the maker's instruction manual. Tiling as well as sealing around the tub should wait up until the bathtub has actually been used at least when as this will resolve it right into its final placement.

    Preparing for the Setup


    Firstly, the supporting structure supplied with the bathroom should be fitted (if called for) according to the manufacturer's directions. Next off, fit the taps or mixer to the bath tub. When fitting the faucet block, it is important to make certain that if the faucet comes with a plastic washing machine, it is fitted in between the bath and also the taps. On a plastic bathroom, it is also practical to fit a sustaining plate under the faucets unit to avoid pressure on the bathtub.
    Fit the versatile faucet connectors to the bottom of the two faucets using 2 nuts as well as olives (often provided with the tub). Fit the plug-hole outlet by smearing mastic filler round the sink electrical outlet hole, and then pass the electrical outlet via the hole in the bath. Utilize the nut provided by the supplier to fit the plug-hole. Examine the plug-hole outlet for an inlet on the side for the overflow pipeline.
    Next off, fit the end of the flexible overflow pipe to the overflow electrical outlet. Afterwards, screw the pipeline to the overflow face which should be fitted inside the bath. Make certain you make use of every one of the supplied washers.
    Link the catch to the bottom of the waste electrical outlet on the bath tub by winding the string of the waste outlet with silicone mastic or PTFE tape, and screw on the trap to the outlet. Link all-time low of the overflow tube in a comparable manner.The bathroom should now be ready to be fitted in its final setting.

    Tiling Around the Bath tub


    In the location where the bath meets the tile, it is necessary to seal the accompanies a silicone rubber caulking. This is necessary as the installation can relocate sufficient to fracture an inflexible seal, creating the water to permeate the wall surface between the bath and the tiling, leading to complications with dampness and also feasible leakages to the ceiling listed below.
    You can select from a variety of coloured sealants to blend in your components and also installations. They are offered in tubes as well as cartridges, and are capable of securing voids as much as a width of 3mm (1/8 inch). If you have a larger void to load, you can load it with spins of soaked paper or soft rope. Bear in mind to constantly fill the bathtub with water prior to securing, to allow for the movement experienced when the bathtub remains in use. The sealant can fracture fairly very early if you do not think about this motion before securing.
    Additionally, ceramic coving or quadrant tiles can be made use of to edge the bathroom or shower tray. Plastic strips of coving, which are easy to use as well as cut to dimension, are likewise easily available on the marketplace. It is recommended to fit the tiles making use of water-resistant or waterproof glue as well as grout.

    Bathtub Installation


    How Important Is A Bathtub To Your Home?


    High-quality baths, showers, and other bathroom updates are necessary when considering a smart investment in your home. It’s a room that you go to every day and one that is constantly being used by guests.The bathroom is one of the top trafficked rooms in a home and also one of the most valuable in terms of home resale.


    Install Piping Before Tub


    You will be using your existing drain and waste vent system, but pipes required include the hot and cold water supply lines and a pipe leading to a shower head. A mixing valve and shower head are also needed. Air chambers may be required.


    Position the Tub


    Lower the tub into place so that the continuous flange fits against the wall studs and rests on 1’x4' or 2’x4' supports. Anchor the tub to the enclosure with nails or screws inserted through the flanges into the studs.



    NOTE: Remember, bathtubs and shower stalls may require support framing. A bathtub filled with water is extremely heavy, so check building codes and framing support before installing the tub.


    Assemble Drain Connections


    Assemble the bathtub drain connections by connecting the tub overflow with the tub drain above the trap, not beyond it. The trap will have a compression fitting that screws over the arm of the overflow assembly.


    Place a Pipe For the Shower Head


    First, locate a brass female threaded winged fitting and attach it to a framing support via a screw or a nail. Then run a pipe up the wall for the shower head. Sweat or solder the other side of the brass fitting to the top of the pipe.


    Attaching Hot and Cold Water Lines


    Attach your water lines for both hot and cold by sweating these directly into the hot and cold ports of the mixing valve. The mixing valve will be how water enters the tub’s system, not by the pipes themselves.


    Install the Spout


    Extend a piece of 1/2 inch pipe, or whichever length is specified in the manufacturer’s instructions, for the tub spout. Sweat on a male threaded fitting at the end of the pipe or use a brass nipple of the proper length and a 1/2 inch cap.



    NOTE: At this point you should have your rough-in plumbing work inspected before proceeding further.


    Check For Leaks


    Restore the water pressure and check the drain connection and the supply pipes for any sign of leaking.


    estore the Bathroom Wall


    Replace the wall with moisture-resistant drywall as a base for your wall covering. Seal the joints between the wall and your new tub with silicone caulk as protection against water seepage.

    https://www.berkeys.com/2016/12/02/bathtub-installation-dallas/


    How to Install a Bathtub: Install an Acrylic Tub and Tub Surround

    I stumbled upon that page on How to Install a Bathtub: Install an Acrylic Tub and Tub Surround while doing a lookup on the internet. Loved our blog entry? Please share it. Help somebody else locate it. Thanks a lot for taking the time to read it.




    Information


    Report this page